Outstanding Major Maintenance List
Updated 6/13/2007

Contact Mark Shively at 307-766-2537 with questions.

 

PRIORITY BUILDING PROJECT DESCRIPTION
2 10th and Lewis Parking Lot Street Maintenance Asphalt 4,200 square yards
2 1315 Lewis Painting Exterior including windows.  2 coats
4 AG A  Painting Exterior
2 AG A  Tunnel  Should do with demolition of the Ag B-E buildings
4 AG B Painting Exterior
1 AG C ADA Modernize bathroom in old AG C
3 AG C Asbestos Abatement Crawl space
1 AG C Backflow Prevention Complete building
2 AG C Caulking Caulking around window systems
2 AG C Ceiling Systems New Addition drop in ceilings
3 AG C Chilled water  Install chilled water mains from basement to hallways and all floors.
1 AG C Electrical System Electrical and IT wiring
1 AG C Elevator ADA-freight
1 AG C Elevator ADA-passenger
2 AG C HVAC  Replacement of unit ventilators
1 AG C Lighting Corridor
1 AG C Painting 328 Windows
1 AG C Roofing  Roofs  P, Q, R, S, T, U. dry and brittle.  Remove BUR, inverted SBS paver &  ballast "R S T U", Perim. Adh. PVC Mech. Att. "P Q K M O" Pave edges. --200 Sq.
2 AG C Window Replacement Replace windows in the old part of AG C
3 AG C ADA Upgrade restrooms
4 AG D Painting Exterior
2 Agronomy Farm Roofing  Roofs on various buildings
1 Animal Science Backflow Prevention Complete building
3 Animal Science HVAC  Relocate heat converters in mech room
2 Arena Lighting Cones and light rails
2 Arena Painting Vent Cones. Including concrete repair.
1 Arena Roofing  Coat roof with lighter colored electrometric
1 Arena Roofing  Remove modify., install taper, adhere 80 mil heat weld membrane.
1 Arena Roofing  Finish E&W skylights & reattach/rebatten lower/upper brown panels.
2 Arena Misc. Install handrails for safety
1 Arena Lighting Upgrade lighting in corridors
2 Arena Concrete Repair Replace broken concrete areas
3 Arena Damp Proofing Eliminate water seepage from interior concrete walls
3 Arena Painting Paint interior walls
3 Arena Painting Paint exterior doors, frames, etc
3 Arena HVAC Replace existing cooling system
1 Arts and Sciences ADA Auditorium ADA to stage
1 Arts and Sciences ADA Restrooms/bring to current standards
2 Arts and Sciences Door and Hardware Replace South and West sides
2 Arts and Sciences Door and Hardware Re-key building
1 Arts and Sciences Electrical System Grounding Auditorium
1 Arts and Sciences HVAC Replace filter banks
1 Arts and Sciences HVAC  Auditorium HVAC replacement
1 Arts and Sciences Lighting Auditorium/classroom lighting
1 Arts and Sciences Lighting Auditorium/stage access 
2 Arts and Sciences Painting Exterior windows
2 Arts and Sciences Stone and Masonry Repair Exterior stone and masonry - new estimate $10,000
1 Aven Nelson Backflow Prevention Complete building
2 Aven Nelson Ceiling Systems Replace ceiling and lights
2 Aven Nelson Concrete Repair Replace steps
2 Aven Nelson Door and Hardware Re-key building, survey building for cost
1 Aven Nelson HVAC Repair Conservatory system
1 Aven Nelson HVAC  Upgrade air handling system
2 Aven Nelson Lighting Upgrades
3 Aven Nelson Misc. Replace blinds
2 Aven Nelson Painting Protective enamel paint repair
2 Aven Nelson Roofing  Remove & replace shingles, install overflows
2 Aven Nelson Stone and Masonry Repair Exterior masonry 
2 Beef Unit Painting Exterior
2 Beef Unit Painting Is this where all the out buildings need paint
2 Beef Unit Roofing Roofs on various buildings
1 Beta House Asbestos Abatement Kitchen gas/water pipes exposed could pose threat of asbestos contamination
1 Beta House Window Replacement Replace all windows
2 Beta House Flooring Replace kitchen floor tiles & countertops
3 Beta House Misc. Replace kitchen faucets
2 Beta House Misc. Repair water damage in meeting room
2 Beta House Window Replacement Replace windows 
2 Bio & Physical Sciences Stone and Masonry Repair Cut out, replace w/ close cell rod, recaulk w/ Dow 795, N,S, & E of Bio, all exposures of Physical
1 Bio Sciences Backflow Prevention Building connection complete, need to isolate the  individual laboratories
2