2007 Major
Maintenance Projects
Updated 1/23/2009
Contact
Mark Shively at 307-766-2537 with questions.
List of 2005 Major Maintenance projects: 2005 MM
List of outstanding Major Maintenance projects:
Outstanding MM
| Job # | Status | Building | Category | Description | Remarks |
| 07-01034 | CONST | Campus | ELEVATOR | PPL ELEVATOR UPGRADES | |
| 09-01990 | CONST | Law Library | ELEVATOR | RENOVATE ELEVATOR | |
| 07-01023 | CONST | Campus | ELEVATOR | REPAIR AND REPLACE ELEVATOR CARS AND CONTROL | |
| 07-01079 | COMPLETE | Campus | ELEVATOR | GROUND ELEVATOR SHAFTS | |
| NEW | Law Library | ELEVATOR | REPLACE HYDRAULC SHAFT | ||
| DESIGN | Campus | ADA | PROJECTS IDENTIFIED IN ADA STUDY/ACCESS REPORT | ||
| 10722 | COMPLETE | Biochemistry | ADA | REPLACE TRENCH DRAIN GRATING | |
| 10793 | COMPLETE | Health Sciences | ADA | CORRECT OCR ISSUES | |
| 07-01119 | COMPLETE | Casper Family Practice | ADA | ELEVATOR ADA UPGRADES | |
| 08-01503 | CONST | Campus | ASBESTOS | ASBESTOS ABATEMENT AND TESTING | |
| 08-01505 | CONST | Wyoming Hall | ASBESTOS | ASBESTOS ABATEMENT | Billing |
| DESIGN | Wyoming Hall | ASBESTOS | ABATE ASBESTOS IN TUNNEL | ||
| 08-01519 | COMPLETE | Service Building | ASBESTOS | ASBESTOS ABATEMENT | |
| 08-01665 | COMPLETE | Forest Service Building | ASBESTOS | ASBESTOS ABATEMENT | |
| 10713 | COMPLETE | Campus | ROOFING | PPL ROOF REPLACEMENTS | |
| 07-01056 | COMPLETE | Corbett | ROOFING | REPLACE ROOFS A E F & G | |
| 07-01054 | COMPLETE | Health Sciences | ROOFING | REMOVE AND REPLACE ROOF | |
| 09-01837 | COMPLETE | Knight Hall | ROOFING | REPLACE ROOF DRAINS | |
| 08-01279 | COMPLETE | Agronomy Farm | ROOFING | REPLACE ROOF | |
| 08-01696 | CONST | Campus | ROOFING | REPLACE HAIL DAMAGED ROOFS | |
| 07-01057 | COMPLETE | Half Acre | ROOFING | REMOVE & REPLACE OVER EXERCISE AREA | |
| 08-01250 | CONST | Jackson Research Center | ROOFING | JOHNSON LODGE & WELL HOUSE: REMOVE & REPLACE ROOF | Punch list |
| 07-01055 | COMPLETE | Classroom building | ROOFING | ROOF REPLACEMENT | |
| DESIGN | Centennial Complex | ROOFING | RENOVATE ROOF | ||
| 07-01071 | COMPLETE | Geology Museum | WINDOWS | REPLACE GLAZING IN DISPLAY CABINETS | |
| CONST | Hoyt | WINDOWS | PHASE 2 WINDOW REPLACEMENT | ||
| DESIGN | Old Main | WINDOWS | REPLACEMENT FOR ENERGY EFFICIENCY AND COMFORT | ||
| CONST | Knight Hall | WINDOWS | PHASE 3 WINDOW REPLACEMENT | ||
| 08-01382 | COMPLETE | Knight Hall | WINDOWS | RELOCATE MECH. EQUIP. TO FACILITATE WINDOW REPLACEMENT | |
| DESIGN | Campus | MISC. | PPL SPECIAL PROJECTS | ||
| 10721 | COMPLETE | Physical Sciences | ELECTRICAL | CORRECT ACCESS TO ELECTRICAL VAULT | |
| 07-01049 | COMPLETE | Campus | CONCRETE | DAY LOT RETAINING WALL REBUILD | |
| 10808 | COMPLETE | Engineering | INTERIOR | REPLACE WINDOW COVERINGS IN PETROLEUM WING | |
| 07-01095 | COMPLETE | Fieldhouse | DOOR | REPLACE ROLLING SERVICE DOOR | |
| 07-01096 | COMPLETE | Day Care | CONCRETE | REMOVE AND REPLACE CONCRETE AND IRRIGATION SYSTEM | |
| 07-01086 | COMPLETE | Half Acre Pool | PLUMBING | REPLACE DRAIN AND FILTERING SYSTEMS, REPAIR TILE | |
| 07-01083 | COMPLETE | Campus | ELECTRICAL | REVAMP MEDIUM VOLTAGE SWITCHES | |
| 08-01264 | COMPLETE | Engineering | PAINTING | HANDRAIL UPGRADES | |
| 08-01184 | COMPLETE | Upholstery Shop | MISC. | FACILITY UPGRADE | |
| 08-01215 | COMPLETE | Education | CONCRETE | REMOVE STAIRS NORTH OF EDUCATION | |
| 08-01394 | COMPLETE | Biological Sciences | HVAC | INSPECT AND CLEAN SMOKE DAMAGED DUCT WORK | |
| 08-01381 | COMPLETE | Animal Science | MISC. | REPLACE STEAM PIPING AND ACCESSORIES TO WASH-DOWN SYSTEMS | |
| 08-01541 | COMPLETE | Foundation House | ELECTRICAL | REPLACE KNOB & TUBE WIRING & CEILING | |
| 08-01342 | COMPLETE | Fine Arts Parking Lot | MISC. | REPLACE WELL CASING | |
| 08-01332 | COMPLETE | Engineering | UTILITIES | REPLACE BUILDING VACUUM PUMP | |
| 08-01689 | CONST | Office Annex | HVAC | REPLACE BOILER | Billing |
| 08-01458 | CONST | Half Acre | PLUMBING | REPLACE DRAIN PIPING AROUND PERIMETER OF POOL | |
| 08-01544 | CONST | Ag A,D | EXTERIOR | EXTERIOR PAINTING & REGRADING | Billing |
| 08-01585 | CONST | State Vet Chem. Lab | PLUMBING | REPLACE WATER CONDITIONING EQUIPMENT | |
| 08-01370 | CONST | State Vet Chem. Lab | MISC. | ANALYSIS & DESIGN OF HVAC UPGRADE | |
| 09-02023 | CONST | Animal Science | PLUMBING | REPLACE RO/DI CONTROLS & PUMPS | Materials ordered |
| 09-02022 | DESIGN | Plant Science Green House | PLUMBING | REPLACE WATER SOFTENER FOR BOILER, RO & WATER HEATER | |
| 07-01043 | COMPLETE | Fieldhouse | MISC. | REPLACE EXISTING BLEACHERS | |
| 10790 | COMPLETE | State Vet Chem. Lab | PLUMBING | REPLACE WATER LINE IN LAB | |
| 07-01044 | COMPLETE | Biological Sciences | PLUMBING | REPLACE WATER SOFTENERS | |
| 07-01048 | COMPLETE | Fieldhouse | DOOR | REPLACE ROLLING SERVICE DOOR | |
| 07-01081 | COMPLETE | Centennial complex | PLUMBING | FLOOD DAMAGE REMEDIATION | |
| 08-01127 | COMPLETE | Classroom Building | ELECTRICAL | REPLACE EMERGENCY GENERATOR | |
| 08-01251 | COMPLETE | Centennial Complex | PLUMBING | RENOVATE DOMESTIC HOT WATER HEATER | |
| 08-01212 | COMPLETE | Earth Sciences | PLUMBING | REPLACE VFDS FOR PUMPS P5 AND P6 ON THE HEATING SYSTEM | |
| 08-01176 | COMPLETE | Williams Conservatory | PLUMBING | REBUILD PROCESS COOLER | |
| 08-01214 | COMPLETE | Ag C | PLUMBING | UPGRADE WATER LINE | |
| 08-01187 | COMPLETE | Stadium | PLUMBING | REPLACE FLUSH VALVES ON EAST AND WEST CONCOURSES | |
| 08-01482 | COMPLETE | Aven Nelson | HVAC | ABATE ASBESTOS IN MECHANICAL ROOM | |
| 08-01467 | COMPLETE | Plant Science Insect Soil Facility | ELECTRICAL | RESTORE ELECTRICAL SERVICE | |
| 08-01378 | CONST | Classroom Building | PLUMBING | REPLACE SEWAGE EJECTORS | Billing |
| 08-01545 | DESIGN | BS & PS | MISC. | GLAZE BLOCK VENIER REPLACEMENT | Design by Malone Belton Able |
| 08-01569 | COMPLETE | State Vet Chem. Lab | MISC. | REPLACE MEDICAL AIR COMPRESSOR IN PENTHOUSE | |
| 09-02018 | CONST | Fine Arts | PLUMBING | REPLACE HEAT CONVERTER | Includes control modifications |
| 09-01807 | CONST | Red Buttes | PLUMBING | DESIGN SEPTIC SYSTEM | |
| 08-01529 | COMPLETE | Agronomy Farm | MISC. | REPLACE PLANKING & BEAM | |
| NEW | Campus | TUNNELS | TUNNEL SECTION REPLACEMENTS AND UPGRADES | ||
| DESIGN | Campus | TUNNELS | DESIGN TUNNEL REPLACEMENT IN FRAT MALL AND OLD MAIN CONNECTION | ||
| 07-01052 | COMPLETE | Campus | ASPHALT/CONCRETE | FY07 REPLACEMENTS PER MAY 2005 STUDY PRIORITIES 1-3 | |
| 10720 | COMPLETE | Campus | ASPHALT/CONCRETE | REMOVE AND REPLACE SIDEWALK AT 9TH & IVINSON | |
| 10760 | COMPLETE | Business | ASPHALT/CONCRETE | REPLACE SOUTH DRIVE WITH ASPHALT | |
| 07-01112 | COMPLETE | Spanish Walk | ASPHALT/CONCRETE | RECONSTRUCT ROAD | |
| 08-01687 | DESIGN | Physical Sciences | ASPHALT/CONCRETE | DEMOLISH AND REPLACE NORTHWEST STAIRS | |
| 08-01559 | CONST | Campus | ASPHALT/CONCRETE | 2008 REPLACEMENT PROJECT | |
| DESIGN | Campus | ASPHALT/CONCRETE | 2009 REPLACEMENT PROJECT | ||
| 07-01089 | CONST | Campus | HVAC | HVAC EQUIPMENT UPGRADES | |
| 10724 | COMPLETE | Engineering | HVAC | MODIFY AIR COMPRESSOR | |
| 07-01070 | COMPLETE | Plant Science Green House | HVAC | REPLACE BOILERS | |
| 07-01075 | COMPLETE | State Vet Chem. Lab | HVAC | REPLACE BOILER FLUE | |
| 10757 | COMPLETE | Campus | ELECTRICAL | EVALUATE AND REPLACE TRANSFORMERS | |
| 08-01275 | COMPLETE | Campus | ELECTRICAL | EVALUATE AND REPLACE TRANSFORMERS | |
| 08-01597 | COMPLETE | Campus | ELECTRICAL | PHASE 4 FOR INFRARED SCANNING OF ELEC/MECH EQUIP | |
| 09-01929 | DESIGN | Ag C | ELECTRICAL | ELECTRICAL DISTRIBUTION UPGRADE | Design by ESC |
| 07-01033 | COMPLETE | Campus | ELECTRICAL | EVALUATE AND REPLACE 15 KV CABLE | |
| 09-02002 | DESIGN | Fieldhouse | ELECTRICAL | REPLACE SWITCH GEAR AND BRANCH CIRCUITS | Design by ESC |
| 104017 | COMPLETE | Fieldhouse | ELECTRICAL | UPGRADE ELECTRICAL PANEL | |
| 07-01058 | COMPLETE | Campus | ELECTRICAL | EAST AND WEST CAMPUS RELAY REBUILDS | |
| 07-01030 | COMPLETE | Campus | ELECTRICAL | INSTALL TVSS'S SURGE SUPPRESSION EACH BUILDING SERVICE | |
| 07-01032 | CONST | Campus | DOOR | EXTERIOR DOOR AND HARDWARE REPLACEMENT | |
| 08-01464 | COMPLETE | Ross Hall | DOOR | REKEY FACILITY | |
| 09-01963 | NEW | Campus | CONTROLS | UPGRADE ADX SYSTEM | |
| 07-01036 | COMPLETE | State Vet Chem. Lab | CONTROLS | REBUILD AIR COMPRESSORS | |
| 08-01199 | DESIGN | Plant Science Green House | CONTROLS | UPGRADE CONTROLS & CONTROL DEVICES | |
| NEW | Campus | LIGHTING | EXTERIOR LIGHTING UPGRADES | ||
| 09-01836 | CONST | Old Main | LIGHTING | UPGRADE EXTERIOR LIGHTING | |
| 09-01935 | COMPLETE | Arena Auditorium | LIGHTING | UPGRADE EXTERIOR LIGHTING | |
| 09-02007 | CONST | Centennial Complex | LIGHTING | UPGRADE EXTERIOR LIGHTING ON WALKWAY | |
| 09-01929 | CONST | Campus | LIGHTING | INTERIOR LIGHTING UPGRADES | |
| 09-01929 | CONST | Ag C | LIGHTING | INTERIOR LIGHTING UPGRADES | |
| 07-01047 | COMPLETE | Fieldhouse | LIGHTING | REPLACE CORRIDOR LIGHTING | |
| DESIGN | Fieldhouse | LIGHTING | INTERIOR LIGHTING UPGRADES INDOOR TRACK | Design by ESC | |
| 07-01017 | COMPLETE | Fine Arts | LIGHTING | UPGRADE LIGHTING IN PUBLIC AREAS AND CORRIDORS | |
| 07-01013 | COMPLETE | Campus | HVAC | REPLACE FILTER BANKS | |
| 08-01688 | COMPLETE | Wainwright Bungalows | HVAC | REBUILD EXHAUST AND MAKE UP AIR UNITS | Major scope change |
| 08-01720 | CONST | Centennial Complex | HVAC | HUMIDIFICATION OF FACILITY | Punch list |
| CONST | Centennial Complex | HVAC | AIR HANDLING/VIBRATING WALL REPAIR | ||
| 07-01012 | CONST | Half Acre | HVAC | REPLACEMENT OF INFIELD HEATING SYSTEM | |
| 08-01128 | COMPLETE | Plant Science Chemical Storage | HVAC | UPGRADE HEATING SYSTEM | |
| 07-01009 | COMPLETE | Ross Hall | HVAC | UPGRADE HV SYSTEM, CONTINUATION OF 05 FUNDING | |
| 07-01039 | COMPLETE | Education Annex | HVAC | UPGRADE HVAC PIPING | |
| 10799 | COMPLETE | Education Annex | HVAC | CHILLED WATER & HEATING SYSTEM | |
| 09-01945 | DESIGN | Campus | HVAC | RENOVATE MECH SYSTEMS IN AVEN NELSON, PHARMACY, AND PHYSICAL AND BIO SCIENENCES | Design by Trane |
| 07-01041 | COMPLETE | Biological Sciences | PLUMBING | REPLACE HOT WATER HEATERS | |
| NEW | State Vet Chem. Lab | PLUMBING | REPAIR DIONIZED WATER SYSTEM | ||
| 07-01045 | COMPLETE | Centennial Complex | PLUMBING | REPLACE DIELECTRIC UNIONS | |
| COMPLETE | Stadium | PLUMBING | HEAT TRACE AND INSULATION | ||
| 07-01125 | COMPLETE | Classroom building | PLUMBING | FIXTURE REPLACEMENT | |
| 07-01082 | COMPLETE | Service Building | PLUMBING | REMOVE LEAKING UNDERGROUND TANK | |
| 08-01367 | CONST | East Campus | PLUMBING | REPLACE IRRIGATION PUMP | Punch list |
| 08-01525 | CONST | Campus | CEILINGS | CEILING SYSTEMS REPLACEMENT AT ENGINEERING BIO SCIENCES AND AVEN NELSON | |
| COMPLETE | Arena | FLOORING | REPLACE WOOD FLOOR | ||
| 08-01343 | COMPLETE | State Vet Chem. Lab | FLOORING | REPLACE EPOXY FLOOR IN NECROPSY ROOM | Canceled due to facility remodel (BSLIII Lab). |
| 07-01062 | CONST | Campus | FLOORING | CARPET REPLACEMENT OFFICE AND DEPARTMENT SPACES | |
| 08-01620 | CONST | Campus | PAINTING | INTERIOR AND EXTERIOR FINISHES | |
| 10668 | COMPLETE | Campus | SHUTDOWN | STEAM DISTRIBUTION IMPROVEMENTS | |
| 10690 | COMPLETE | Campus | SHUTDOWN | 2006 STEAM DISTRIBUTION IMPROVEMENTS | |
| 07-01099 | COMPLETE | Campus | SHUTDOWN | 2007 STEAM DISTRIBUTION IMPROVEMENTS | |
| 07-01029 | COMPLETE | Pharmacy | UTILITIES | REPLACE VACUUM SYSTEM | |
| 07-01042 | COMPLETE | Service Building | UTILITIES | REPLACE PRV STATIONS | |
| 07-01102 | COMPLETE | Central Energy Plant | UTILITIES | REPLACE TURBO ON GENSET | |
| 07-01122 | COMPLETE | Campus | UTILITIES | INFRARED TESTING | |
| 08-01728 | CONST | Campus Greenhouse | UTILITIES | REPLACE STEAM PRESSURE REDUCING STATION | Punch list |
| 07-01019 | COMPLETE | Campus | UTILITIES | CONDENSATE METER IMPROVEMENTS AND INFRARED SCANNING | |
| 08-01274 | COMPLETE | Campus | UTILITIES | PHASE 3 FOR INFRARED SCANNING | |
| 10702 | COMPLETE | Campus | UTILITIES | CHILLED WATER COILS BUILDING CONNECTION AND LINE REPLACEMENTS | |
| 10796 | COMPLETE | Central Energy Plant | UTILITIES | RENOVATE CHILLER NO 1 | |
| 07-01107 | CONST | Campus | UTILITIES | REPLACE VALVES AT CHILLED H2O COILS | |
| 07-01088 | COMPLETE | WTBC | UTILITIES | REPLACE AND REPAIR COOLING COILS | |
| 08-01610 | COMPLETE | Central Energy Plant | UTILITIES | CHILLER #2 BACKUP UNIT 09 | |
| 10710 | COMPLETE | Physical Sciences | UTILITIES | REPLACE HEAT PUMPS & LIQUID MOVERS | |
| 07-01038 | COMPLETE | Centennial Complex | UTILITIES | REPLACE CHILLER WITH CHILLED WATER LINE | |
| 08-01137 | COMPLETE | Central Energy Plant | UTILITIES | REPLACE CONTROLS ON THE BOILERS AN COMPRESSORS | |
| 10682 | COMPLETE | Central Energy Plant | UTILITIES | REPLACE SOOT BLOWER CONTROL PANEL | |
| 07-01098 | COMPLETE | Central Energy Plant | UTILITIES | HYDROBLAST FIRE SIDE TUBES ON BOILER | |
| 07-01101 | CONST | Central Energy Plant | UTILITIES | INSTALL ADDITIONAL SOOT BLOWER ON 2 | |
| 07-01097 | COMPLETE | Central Energy Plant | UTILITIES | REMOVE CONDENSATE RETURN TANK LINER | |
| 07-01100 | COMPLETE | Central Energy Plant | UTILITIES | REPLACE REINJECTORS IN COAL BOILERS | |
| 08-01643 | COMPLETE | State Vet Chem. Lab | UTILITIES | REMOVE UNDERGROUND STORAGE TANK | |
| 09-01804 | CONST | State Vet Chem. Lab | UTILITIES | REMEDIATION | |
| NEW | Campus | UTILITIES | IT WIRING UPGRADES | ||
| NEW | State Vet Chem. Lab | UTILITIES | WATER LINE REPLACEMENT | ||
| CONST | Centennial Complex | LIFE SAFETY | FIRE SUPPRESSION REPLACEMENT | ||
| 08-01340 | COMPLETE | Campus | LIFE SAFETY | EMERGENCY GENERATOR REBUILDS | |
| 08-01639 | CONST | Campus | SIGNS | REFURBISH POST & PANEL SIGNS | Billing |
| 07-01021 | DESIGN | Arts and Sciences | STAGE | STAGE RIGGING AT A&S AND FINE ARTS | |
| 07-01018 | CONST | Campus | STAGE | REPLACE SOUND SYSTEMS IN A&S, EDUCATION, FINE ARTS AUDITORIUMS AND FIELDHOUSE | Arts and Science complete; working on Fine Arts and Education |
| 07-01022 | CONST | Fine Arts | STAGE | IMPROVE CORRIDOR LIGHTING | |
| 07-01020 | COMPLETE | Fine Arts | STAGE | REPLACE STAGE RIGGING AND PIT LIFT | Pit lift delayed |
| 08-01348 | CONST | Earth Sciences | MISC. | REPLACE PERCHLORICFUME HOOD | Materials ordered |
| DESIGN | Campus | MISC. | FUME HOOD REPLACEMENTS | ||
| 08-01256 | CONST | East Campus | MISC. | EAST CAMPUS DRAINAGE PROJECT | Working with City |
| 08-01202 / 08-01386 | CONST | Central Energy Plant | MISC. | RELOCATE FUEL FACILITY | Punch list |
| CONST | Student Health | MISC. | PROJECTS DONE WITH FACILITY RENOVATION | ||
| CONST | Education Annex | MISC. | PROJECTS DONE WITH FACILITY RENOVATION | ||
| CONST | Kappa Sigma/Honors | MISC. | PROJECTS DONE WITH FACILITY RENOVATION | ||
| DESIGN | Kendall House | MISC. | PROJECTS DONE WITH FACILITY RENOVATION | ||
| CONST | Coe | MISC. | PROJECTS DONE WITH FACILITY RENOVATION | ||
| NEW | Campus | MISC. | POOL CLASSROOM REPAIR |