2005 Major
Maintenance Projects
Updated 1/23/2009
Contact
Mark Shively at 307-766-2537 with questions.
| Job # | Status | Building | Description | Remarks |
| 077023 | COMPLETE | Prexy's | REDUNDANT CONDENSATE LINE | |
| COMPLETE | Campus | ADA Access North Side | ||
| 10238 | COMPLETE | Animal Science | FUME HOOD FAN REPLACEMENT | |
| 10239 | COMPLETE | Animal Science/Mol Bio | Re-Roof | |
| 10324 | COMPLETE | Red Buttes | Re-Roof | |
| COMPLETE | Office Annex | HVAC Upgrade | ||
| COMPLETE | Campus | Elevator Repair and Replacement | Moved to ADA Ref. #10 | |
| 10281 | COMPLETE | Campus | EXTERIOR LIGHTING | |
| COMPLETE | Centennial Complex | Roof Upgrade | ||
| 10340 | COMPLETE | Campus | ADA PROJECTS | Elevator Mods |
| 10610 | COMPLETE | Ross Hall | RESTROOMS | |
| 07-01005 | COMPLETE | Old Main | RESTROOM | |
| 10229 | COMPLETE | Cowboy Field | ADA MODIFICATIONS | |
| 10400 | COMPLETE | COB Auditorium | REMODEL | |
| 10546 | COMPLETE | College of Business | DOOR & HARDWARE REPLACEMENT | |
| 10392 | COMPLETE | Fine Arts | STAGE FLOOR REPLACEMENT | |
| 10334 | COMPLETE | RMMC | LEAK DETECTION ALARM SYSTEM | |
| 080850 | COMPLETE | Wyo Hall | MODIFY CONTAINMENT | |
| 10438 | COMPLETE | A&S Auditorium | PAINTING, UPHOLSTER EXISTING SEATING | |
| COMPLETE | Centennial Complex | Alarm System | ||
| 082008 | COMPLETE | Centennial Complex | FIX CONTROL SYSTEM | |
| 10499 | COMPLETE | Classroom Building | OIL SWITCH DISCONNECT REPLACEMENT | |
| 10635 | COMPLETE | 457 Soule St. | ADA RAMP | |
| 10516 | COMPLETE | Ivinson Bldg | REMP COOLING & REBUILD AIR HANDLER | |
| 07-01003 | COMPLETE | Ag C Auditorium | REPLACE HVAC SYSTEM | |
| 10375 | COMPLETE | Arena Auditorium | CHANGE STEAM PRESSURE | Paid $33,921.29 on Major Maint 04. Total $38,797.24 on MM 05. |
| 10502 | COMPLETE | Ross Hall | HEATING REPAIR | |
| 10521 & 100042 | COMPLETE | Old Main | REPLACE SEWER | |
| 10041 | COMPLETE | Engineering | REPLACE AIR CONDITIONER | Dept paid $7,500; total project $17,134.85 |
| 10593 | COMPLETE | Engineering | REPLACE AIR CONDITIONER | Dept paid $7,500; total project $23,141.42 |
| 10569 | COMPLETE | Plant Science Greenhouse | REPAIR BOILER | |
| 9920 | COMPLETE | Recreation Area | RECREATION AREA BATHROOM COSTS | |
| 10442 | COMPLETE | Foundation House | CARPETING WHOLE HOUSE | UW Foundation pays amount over $40,000 |
| 10337 | COMPLETE | Half Acre | WATER HEATER REPLACEMENT | |
| 10338 | COMPLETE | Sigma Phi Epsilon | WATER HEATER REPLACEMENT | |
| 10330 | COMPLETE | Biological Sciences | WELL REPAIR BASEMENT | |
| 07-01046 | COMPLETE | Hoyt Hall | SANITARY SEWER REPLACEMENT | |
| 080897 | COMPLETE | Campus | CONCRETE | |
| 081258 | COMPLETE | Campus | CONCRETE | |
| 080898 | COMPLETE | Wyo Hall | CONCRETE | |
| 10211 | COMPLETE | Willet Curb & Gutter | CONCRETE | 20% of total - 80% Major Maint 04 |
| 10247 | COMPLETE | 19th & Willet | BUS SHELTER PAD | First $75,000 pd by STR |
| 10251 | COMPLETE | Union Parking Lot | UNION PARKING LOT | First $80,000 pd by Transpark Fed Grant |
| 10377 | COMPLETE | Campus | CONCRETE & ASPHALT STUDY | |
| 10358 | COMPLETE | Field House N Addition | EFIS WALLS | |
| 07-01002 | COMPLETE | Campus | ELECTRICAL WIRING RETROFIT | |
| 10347 | COMPLETE | Kappa Sigma | EXTERIOR REPAIRS | |
| 10328 | COMPLETE | Biological Sciences | ROOFS | |
| 10394 | COMPLETE | Ag C Addition | ROOFS | |
| 10389 | COMPLETE | Multipurpose Gym | ROOFS | |
| 10382 | COMPLETE | WRI | ROOFS | |
| 10365 | COMPLETE | Arena Auditorium | ROOFS | |
| 10361 | COMPLETE | Old Main | ROOFS | |
| 10278 | CONST | Natl Park Serv Res Ctr | ROOFS | Part of Major Maintenance 07 Project |
| 10561 | COMPLETE | Corbett | RE-PIPE POOL | |
| 10423 | CONST | War Memorial Stadium | ELECTRICAL DISTRIBUTION SYSTEM | |
| 10629 | COMPLETE | Agriculture | GENERATOR | |
| CONST | Office Annex | Remodel | Punch list with Aspen Banner | |
| 095372 | COMPLETE | Campus | TRANSFORMER OIL TESTING | |
| 07-01120 | COMPLETE | AMK Ranch | RENOVATE ROOF & ELECTRICAL | |
| 07-01025 | CONST | Half Acre | WINDOW REPLACEMENT | Construction in progress, substantial complete February 2009 |
| 08-01252 | COMPLETE | War Memorial Stadium | UPGRADE LIGHTING AROUND STADIUM & ARENA | |
| CONST | War Memorial Stadium | Structural Repairs | Will be completed in conjunction with project beginning 2008 | |
| 10491 | COMPLETE | Centennial Complex | SURVEY OF FIRE PROTECTION SYSTEM | |
| 10501 | COMPLETE | Centennial Complex | SURVEY OF DIELECTRIC UNIONS | Complete with Major Maint 07 Funds |