2005 Major Maintenance Projects
Updated 1/23/2009

Contact Mark Shively at 307-766-2537 with questions.

 

Job # Status Building Description Remarks
077023 COMPLETE Prexy's REDUNDANT CONDENSATE LINE  
  COMPLETE Campus ADA Access North Side  
10238 COMPLETE Animal Science FUME HOOD FAN REPLACEMENT  
10239 COMPLETE Animal Science/Mol Bio Re-Roof  
10324 COMPLETE Red Buttes Re-Roof  
  COMPLETE Office Annex HVAC Upgrade  
  COMPLETE Campus Elevator Repair and Replacement Moved to ADA Ref. #10
10281 COMPLETE Campus EXTERIOR LIGHTING  
  COMPLETE Centennial Complex Roof Upgrade  
10340 COMPLETE Campus ADA PROJECTS Elevator Mods
10610 COMPLETE Ross Hall RESTROOMS  
07-01005 COMPLETE Old Main RESTROOM  
10229 COMPLETE Cowboy Field ADA MODIFICATIONS  
10400 COMPLETE COB Auditorium REMODEL  
10546 COMPLETE College of Business DOOR & HARDWARE REPLACEMENT  
10392 COMPLETE Fine Arts STAGE FLOOR REPLACEMENT  
10334 COMPLETE RMMC LEAK DETECTION ALARM SYSTEM  
080850 COMPLETE Wyo Hall MODIFY CONTAINMENT  
10438 COMPLETE A&S Auditorium PAINTING, UPHOLSTER EXISTING SEATING  
  COMPLETE Centennial Complex Alarm System  
082008 COMPLETE Centennial Complex FIX CONTROL SYSTEM  
10499 COMPLETE Classroom Building OIL SWITCH DISCONNECT REPLACEMENT  
10635 COMPLETE 457 Soule St. ADA RAMP  
10516 COMPLETE Ivinson Bldg REMP COOLING & REBUILD AIR HANDLER  
07-01003 COMPLETE Ag C Auditorium REPLACE HVAC SYSTEM  
10375 COMPLETE Arena Auditorium CHANGE STEAM PRESSURE Paid $33,921.29 on Major Maint 04.  Total $38,797.24 on MM 05.
10502 COMPLETE Ross Hall HEATING REPAIR  
10521 & 100042 COMPLETE Old Main REPLACE SEWER  
10041 COMPLETE Engineering REPLACE AIR CONDITIONER Dept paid $7,500; total project $17,134.85
10593 COMPLETE Engineering REPLACE AIR CONDITIONER Dept paid $7,500; total project $23,141.42
10569 COMPLETE Plant Science Greenhouse REPAIR BOILER  
9920 COMPLETE Recreation Area RECREATION AREA BATHROOM COSTS  
10442 COMPLETE Foundation House CARPETING WHOLE HOUSE UW Foundation pays amount over $40,000
10337 COMPLETE Half Acre WATER HEATER REPLACEMENT  
10338 COMPLETE Sigma Phi Epsilon WATER HEATER REPLACEMENT  
10330 COMPLETE Biological Sciences WELL REPAIR BASEMENT  
07-01046 COMPLETE Hoyt Hall SANITARY SEWER REPLACEMENT  
080897 COMPLETE Campus CONCRETE  
081258 COMPLETE Campus CONCRETE  
080898 COMPLETE Wyo Hall CONCRETE  
10211 COMPLETE Willet Curb & Gutter CONCRETE 20% of total - 80% Major Maint 04
10247 COMPLETE 19th & Willet BUS SHELTER PAD First $75,000 pd by STR
10251 COMPLETE Union Parking Lot UNION PARKING LOT First $80,000 pd by Transpark Fed Grant
10377 COMPLETE Campus CONCRETE & ASPHALT STUDY  
10358 COMPLETE Field House N Addition EFIS WALLS  
07-01002 COMPLETE Campus ELECTRICAL WIRING RETROFIT  
10347 COMPLETE Kappa Sigma EXTERIOR REPAIRS  
10328 COMPLETE Biological Sciences ROOFS  
10394 COMPLETE Ag C Addition ROOFS  
10389 COMPLETE Multipurpose Gym ROOFS  
10382 COMPLETE WRI ROOFS  
10365 COMPLETE Arena Auditorium ROOFS  
10361 COMPLETE Old Main ROOFS  
10278 CONST Natl Park Serv Res Ctr ROOFS Part of Major Maintenance 07 Project
10561 COMPLETE Corbett RE-PIPE POOL  
10423 CONST War Memorial Stadium ELECTRICAL DISTRIBUTION SYSTEM  
10629 COMPLETE Agriculture GENERATOR  
  CONST Office Annex Remodel Punch list with Aspen Banner
095372 COMPLETE Campus TRANSFORMER OIL TESTING  
07-01120 COMPLETE AMK Ranch RENOVATE ROOF & ELECTRICAL  
07-01025 CONST Half Acre WINDOW REPLACEMENT Construction in progress, substantial complete February 2009
08-01252 COMPLETE War Memorial Stadium UPGRADE LIGHTING AROUND STADIUM & ARENA  
  CONST War Memorial Stadium Structural Repairs Will be completed in conjunction with project beginning 2008
10491 COMPLETE Centennial Complex SURVEY OF FIRE PROTECTION SYSTEM  
10501 COMPLETE Centennial Complex SURVEY OF DIELECTRIC UNIONS Complete with Major Maint 07 Funds