2005 Major
Maintenance Projects
Updated 12/17/2007
Contact
Mark Shively at 307-766-2537 with questions.
| Job # | Building | Description | Status | Remarks |
| 077023 | Prexy's | REDUNDANT CONDENSATE LINE | COMPLETE | |
| Campus | ADA Access North Side | COMPLETE | ||
| 10238 | Animal Science | FUME HOOD FAN REPLACEMENT | COMPLETE | |
| 10239 | Animal Science/Mol Bio | Re-Roof | COMPLETE | |
| 10324 | Red Buttes | Re-Roof | COMPLETE | |
| Office Annex | HVAC Upgrade | DESIGN | Part of facility remodel | |
| Campus | Elevator Repair and Replacement | COMPLETE | Moved to ADA Ref. #10 | |
| 10281 | Campus | EXTERIOR LIGHTING | COMPLETE | Amount committed for new lighting project at South Side of Stadium |
| Centennial Complex | Roof Upgrade | COMPLETE | Remainder of project next spring | |
| 10340 | Campus | ADA PROJECTS | COMPLETE | Elevator Mods |
| 10610 | Ross Hall | RESTROOMS | COMPLETE | |
| 07-01005 | Old Main | RESTROOM | COMPLETE | |
| 10229 | Cowboy Field | ADA MODIFICATIONS | COMPLETE | |
| 10400 | COB Auditorium | REMODEL | COMPLETE | |
| 10546 | College of Business | DOOR & HARDWARE REPLACEMENT | COMPLETE | |
| 10392 | Fine Arts | STAGE FLOOR REPLACEMENT | COMPLETE | |
| 10334 | RMMC | LEAK DETECTION ALARM SYSTEM | COMPLETE | |
| 080850 | Wyo Hall | MODIFY CONTAINMENT | COMPLETE | |
| 10438 | A&S Auditorium | PAINTING, UPHOLSTER EXISTING SEATING | COMPLETE | |
| Centennial Complex | Alarm System | COMPLETE | ||
| 082008 | Centennial Complex | FIX CONTROL SYSTEM | COMPLETE | |
| 10499 | Classroom Building | OIL SWITCH DISCONNECT REPLACEMENT | COMPLETE | |
| 10635 | 457 Soule St. | ADA RAMP | COMPLETE | |
| 10516 | Ivinson Bldg | REMP COOLING & REBUILD AIRHANDLER | COMPLETE | Total cost $28,644.99 split with IT |
| 07-01003 | Ag C Auditorium | REPLACE HVAC SYSTEM | COMPLETE | |
| 10375 | Arena Auditorium | CHANGE STEAM PRESSURE | COMPLETE | Paid $33,921.29 on Major Maint 04. Total $38,797.24 |
| 10502 | Ross Hall | HEATING REPAIR | COMPLETE | |
| 10521 & 100042 | Old Main | REPLACE SEWER | COMPLETE | |
| 10041 | Engineering | REPLACE AIR CONDITIONER | COMPLETE | Dept paid $7,500; total project $17,134.85 |
| 10593 | Engineering | REPLACE AIR CONDITIONER | COMPLETE | Dept paid $7,500; total project $23,141.42 |
| 10569 | Plant Science Greenhouse | REPAIR BOILER | COMPLETE | |
| 9920 | Recreation Area | RECREATION AREA BATHROOM COSTS | COMPLETE | |
| 10442 | Foundation House | CARPETING WHOLE HOUSE | COMPLETE | UW Foundation pays amount over $40,000 |
| 10337 | Half Acre | WATER HEATER REPLACEMENT | COMPLETE | |
| 10338 | Sigma Phi Epsilon | WATER HEATER REPLACEMENT | COMPLETE | |
| 10330 | Biological Sciences | WELL REPAIR BASEMENT | COMPLETE | |
| 07-01046 | Hoyt Hall | SANITARY SEWER REPLACEMENT | COMPLETE | |
| 080897 | Campus | CONCRETE | COMPLETE | |
| 081258 | Campus | CONCRETE | COMPLETE | |
| 080898 | Wyo Hall | CONCRETE | COMPLETE | |
| 10211 | Willet Curb & Gutter | CONCRETE | COMPLETE | 20% of total - 80% Major Maint 04 |
| 10247 | 19th & Willet | BUS SHELTER PAD | COMPLETE | First $75,000 pd by STR |
| 10251 | Union Parking Lot | UNION PARKING LOT | COMPLETE | First $80,000 pd by Transpark Fed Grant |
| 10377 | Campus | CONCRETE & ASPHALT STUDY | COMPLETE | |
| 10358 | Field House N Addition | EFIS WALLS | COMPLETE | |
| 07-01002 | Campus | ELECTRICAL WIRING RETROFIT | DESIGN | Design with outside Electrical System Consultants; includes relighting projects |
| 10347 | Kappa Sigma | EXTERIOR REPAIRS | COMPLETE | |
| 10328 | Biological Sciences | ROOFS | COMPLETE | |
| 10394 | Ag C Addition | ROOFS | COMPLETE | |
| 10389 | MultiPurpose Gym | ROOFS | COMPLETE | |
| 10382 | WRI | ROOFS | COMPLETE | |
| 10365 | Arena Auditorium | ROOFS | COMPLETE | |
| 10361 | Old Main | ROOFS | COMPLETE | |
| 10278 | Natl Park Serv Res Ctr | ROOFS | CONST | Part of Major Maintenance 07 Project |
| 10561 | Corbett | RE-PIPE POOL | COMPLETE | |
| 10423 | War Memorial Stadium | ELECTRICAL DISTRIBUTION SYSTEM | CONST | |
| 10629 | Agriculture | GENERATOR | COMPLETE | |
| Office Annex | Remodel | CONST | Punch list with Aspen Banner | |
| 095372 | Campus | TRANSFORMER OIL TESTING | COMPLETE | |
| 07-01120 | AMK Ranch | RENOVATE ROOF & ELECTRICAL | BIDDING | Project in Progress with Major Maint 07 |
| 07-01025 | Half Acre | WINDOW REPLACEMENT | BIDDING |