Campus Construction Update for Week of Dec. 2-8

Printable Article Email this Article

Facilities Planning project managers issued the following  report for week of Dec. 2-8:

ILLC -- Information Library and Learning Center (Scheduled completion date: September 2009)
Work for week of  Dec. 3 includes:

-- Excavation and installation of shoring.

-- Storm sewer installation between Coe Library and the Wyoming Union.

-- Rough in for electrical distribution panels in the 1970s addition.

-- Disassembling  steam vault and controls in utility tunnel between Coe Library and the Wyoming Union.

Additionally, 13th Street will remain as is, open but restricted access near the circle drive at the Union.  The work between the Union and Coe Library should wrap up near the end of the week.  The street and alley way will have a temporary patch over the excavation by the end of the week.  The handicap parking at the union and access to the south doors to the Union should be open by Friday.

Information Technology Facility (Scheduled completion date: December 2008)

The foundation and basement are nearly complete. The big blue crane will be on-site through the completion of steel erection. Large truck traffic for steel delivery and concrete will continue through the duration of steel erection and be may be heavier on some days.

UW Plaza (Hotel and Conference Center)

The overall site work is complete with the exception of some landscaping. The new stoplight at 24th and Grand is scheduled for completion early in 2008. The signs on the site are scheduled to be completed in January. The Hotel and Conference Center is scheduled to open in February.

Indoor Practice Facility

The landscaping and site work will not be completed because of the onset of cold weather and lack of an irrigation system to support the landscaping this fall. Much detail-related work remains.

Hoyt Hall Window Replacement

Replacement of Hoyt Hall windows will cause minor sidewalk closures around the building through  Dec. 11. The staging area is in the south four parking spots of the Hoyt Hall parking lot. Anticipated completion of the Hoyt Hall Window Replacement is Dec. 18.

Posted on Friday, November 30, 2007

Rate this article:  Current Rating: 2.5Current Rating: 2.5Current Rating: 2.5Current Rating: 2.5Current Rating: 2.5